top of page
CWMF Corp. Yard Expansion
Waite Park, MN
Date: October 2021-July 2022
Location: Waite Park, MN
Owner: CWMF Corp
Engineer: Schultz Engineering
Craig Bardson Excavating performed all sitework to develop an 11 acre field into a storage lot to accommodate CWMF Corp's need for additional space. Bardson moved over 70,000 CY to build the lot to proposed subgrades. 21,500 Tons of class 5 base was brought in and placed and topped off with almost 11,000 tons of class 2 granite to make a solid surface for the storage area. The project also included installation of storm sewer and clearing and grubbing. Final seeding and stabilization was done by North Star Landscaping.
1/15
bottom of page